AndyMark will be closed for the Memorial Day Holiday on Monday, May 30th. Wishing everyone a safe & happy holiday weekend!
6 in. long, Lead screw WITH nut
am-3342
$90.00
This ACME, precision lead screw with two (2) starts has right hand threads of five (5) turns per inch. The lead screw is made from high strength 4140 steel and has been machined to fit into the DAR...Read More
0 reviews
Write a ReviewProduct Overview
This ACME, precision lead screw with two (2) starts has right hand threads of five (5) turns per inch. The lead screw is made from high strength 4140 steel and has been machined to fit into the DART linear actuator. The bronze nut rides smoothly over the lead screw threads, and has it's own threads on the outside diameter in order to be mounted into a tube, shaft, or housing. This pair is useful in many robotic applications to turn rotational motion from a motor into linear motion as the nut travels the length of the lead screw. This is the lead screw and nut used in the DART linear actuator.
These PowerAc Inch Acme screws and nuts include a centralizing thread form to prevent wedging and binding. When compared to general-purpose thread forms, centralizing threads are manufactured with tighter tolerances and reduced clearance on the major diameter to increase precision and reduce issues.
Nut Specifications:
These PowerAc Inch Acme screws and nuts include a centralizing thread form to prevent wedging and binding. When compared to general-purpose thread forms, centralizing threads are manufactured with tighter tolerances and reduced clearance on the major diameter to increase precision and reduce issues.
Nut Specifications:
Specifications
- Outside Diameter: 0.5 in.
- Pitch: 0.1 in.
- Product Lifecycle: Other options available, <a href='/products/lead-screw-and-nut-options?sku=am-3342'>see this product and other options here.</a>
- Weight: 0.507 lbs
Returns
Returns are accepted within 30 days of purchase.
View our return policy here.